1. |
Four laning of NH-24 from Km 27.643 to 48.638 and construction of Hapur Bypass |
NHAI |
1153.61 |
2. |
Rehabilitation and upgrading of Surat-Manor section of NH-8, SMTP-II |
PEL Mumbai |
2550.00 |
3. |
Widening to 4 lanes and Rehabilitation of Existing 2-lane carriageway of Krishnagiri-Vaniyambadi section of NH-46 (Package KR-1) |
NHAI |
1714.25 |
4. |
Widening to 4/6 lanes and Strengthening of the existing 2-lane carriageway from km 178.00 to 222.00 (Nellore - Kavali) of NH-5 (Package AP-11) |
NHAI |
1612.19 |
5. |
Rehabilitation and Strengthening of (i) Morena – Sabalgarh Section SH-2 and (ii) Sabalgarh - Shampur Section SH-23 |
MPRDC Bhopal |
848.1 |
6. |
Widening and Strengthening of 42kms stretch of Madurai-Kanyakumari NH-7 section from 2 lanes to 4 lanes. (Package NS-43) |
NHAI |
2014.10 |
7. |
Construction of Major Bridge Across River Godavari (Length 1.780 Kms) and its approaches (Length 18.690 Kms) at Eturunagaram on Hyderabad – Bhoopalapatnam Road of NH No. 163 (Old NH No. 202) including realignment in 1.960 Km length at 5 locations between Km 284/150 to 298/200-910 in the State of Andhra Pradesh under LWE Scheme |
SE, NH Circe,Erramanzil,Hyderbad |
1240.14 |
8. |
Bijapur-Hungund Project(Package-KNT-05) 4 Laning of Bijapur-Hungund Section of NH-13 from Km 102.00 to Km 202.00 in the State of Karnataka under NHDP Phase-III costing ` 8250.00 million by SPV Viz. Bijapur- Hungund Tollway Pvt. Ltd., through M/s. Sadbhav Engineering Ltd., under EPC contract to M/s. KNRCL. |
SEL |
8250.00 |
9. |
Widening and strengthening of 18 km stretch of Lumbding-Lanka National Highway from single lane to 4 lanes in the State of Assam. (Package AS-15) |
NHAI |
1510.46 |
10. |
Widening and strengthening of Nagaon- Dharamtul National Highway from 2 lanes to 4 lanes in the State of Assam (Package AS-18). |
NHAI |
3297.70 |
11. |
Widening to 4/6 lanes of NH-7 of Madurai-Kanyakumari section in the State of Tamil Nadu from Km 203 to Km 234.690 (Package NS-32). |
NHAI |
1980.52 |
12. |
Balance work of widening to 4/6 lanes and strengthening of existing 2-lane carriageway of NH-5 in the state of Orissa from Km. 284.000 to Km. 338.000 (Ganjam–Sunakhala), Construction Package OR-VII |
NHAI |
1865.87 |
13. |
Four laning of Walayar – Vadakkancherry Section in Kerala (Km 182/250 to Km 240/000 of NH – 47) – Package NS-2/BOT/KL-2 – on DBFOT (Toll) basis under NHDP Phase-II in the state of Kerala |
National Highways Authority of India |
790.50 |
14. |
Design, Construction, Development, Finance, Operation and Maintenance of Km 463.6 (AP/Karnataka border) to Km 524.0 (Avathi Village) and (ii) Improvement, Operation and Maintenance of Km 524 (Avathi Village) to Km 527 (Nandi Hills Crossing) and Km 535 (Devanhalli Village) to Km 539 (Meenukunte Village) on NH-7 in the State of Karnataka under North-South Corridor (NHDP Phase II) on BOT (Annuity) Basis - Package No. NS2/BOT/KNT-1, KNR as EPC Contractor, Chikballapur (Karnataka) & Roads and Bridges. |
National Highways Authority of India |
350.00 |
15. |
Rehabilitation and upgradation of existing NH-565 from Km 425/400 to Km 509/400 (Penchelakona to Yerpedu section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV |
Ministry of Road Transport and Highways |
209.25 |
16. |
Design, Construction, Development, Finance, Operation and Maintenance of Km 230/000 (Islam Nagar) to Km 278/000 (Kadtal) on NH-7 in the state of Andhra Pradesh under North – South Corridor (NHDP Phase II) on BOT (Annuity) Basis - Package No. NS-2/ BOT/ AP-07 KNR as Sub-contractor, Nirmal (Telangana) & Roads and Bridges. |
National Highways Authority of India |
503.00 |
17. |
Four laning of Walayar - Vadakkancherry section in Kerala (Km 182.250 to Km 240.000 of NH-47) - Package NS-2/ BOT/KL-2 in the State of Kerala |
KNR Walayar Tollways Private Limited |
7905.00 |
18. |
Rehabilitation and upgradation of existing NH-565 from Km 425/400 to Km 509/400 (Penchalakona to Yerpedu section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis Contract |
E-in-C (R&B), NH, Andhra Pradesh |
1167.82 |
19. |
Upgradation of the Road from Magadi NH-48(KM 0+000) to Koratagere(Km 68+200) of SH-3 in Ramnagara and Tumkur Districts (Package No:KSHIP-II/STAGE-II/ICB/AEP1) |
KSHIP, Bangalore |
1167.82 |
20. |
Nagpur – Saoner – Betul Project – Construction Contract 01: Four laning of Km 76.000 to Km 117.500 of Nagpur – Saoner – Betul Section of NH-69 in the State of Madhya Pradesh |
Oriental Structural Engineers |
3330.16 |
21. |
Upgradation of the Road from Shelvadi (KM 0+000) to Mundargi (KM 63+400) of SH-45 in Dharwad and Gadag Districts (Package No: KSHIP-II/STAGE-II/ICB/AEP7) |
KSHIP, Bangalore |
1212.54 |
22. |
Upgradation of the Road from Mudgal (KM 0+000) to Gangawathi (KM 74+200) of SH-29 in Koppal and Raichur Districts (Package No: KSHIP-II/STAGE-II/ICB/AEP8) |
KSHIP, Bangalore |
1526.26 |
23. |
Package NS - 32/TN - Balance works of Widening to 4-/6- lanes and Strengthening of Existing 2-lane Carriageway of NH-7 (Madurai – Kanniyakumari section) in the state of Tamil Nadu from Km 203.000 (of existing NH, Panagudy) to Km 234.690 (end point of proposed Kanniyakumari bypass) |
National Highways Authority of India |
206.00 |
24. |
Four laning and strengthening of existing two lanes from km 0.00 to 48.817 of Madurai – Kanyakumari section of NH 7 in Tamil Nadu-- Contract Package No. NS-39/TN. |
National Highways Authority of India |
282.58 |
25. |
Four laning and strengthening of Existing 2 lanes from km.160.00 to km.203.00 of Madurai – Kanyakumari section of NH 7 in Tamilnadu -Contract Package No. NS-43/TN |
National Highways Authority of India |
224.35 |
26. |
Widening and strengthening of Existing National Highway from Km. 22.000 to Km. 40.000 (NH-54E) of Lanka to Lumding Section of NH-54 in Assam on East West Corridor under Phase-II Progremme of NHDP - Package No. EW-II (AS-15) |
National Highways Authority of India |
143.96 |
27. |
Widening and strengthening of Existing National Highway from 2 lane to 4 lane from km.262.70 to km.255.00 of Nagaon to Dharamtul section of NH-37 and 4 Lanning of Nagaon Bypass from Km.280.57 (NH-37) Crossing NH-36 Near Km.5.00 and upto Km. 262.70 of NH-37 in Assam on East West Corridor Under Phase – II Programme of NHDP – Contract Package No. EW-II (AS-18) |
National Highways Authority of India |
238.72 |
28. |
Balance work of widening to 4/6 lanes and strengthening of existing 2-lane carriageway of NH-5 in the state of Orissa from Km. 284.000 to Km. 338.000 (Ganjam–Sunakhala), Construction Package OR-VII |
National Highways Authority of India |
231.28 |
29. |
Construction of Major Bridge across River Godavari (Length 1.780 Kms) and its approaches (Length 18.690 Kms) at Eturunagaram on Hyderabad – Bhoopalapatnam Road of NH No. 163 (Old NH No. 202) including realignment in 1.960 Km length at 5 locations between Km 284/150 to 298/200-910 in the State of Andhra Pradesh under LWE Scheme |
EE, R&B, NH Division, Eturunagaram |
206.69 |
30. |
Package No.1 – Rehabilitation and Strengthening of (i) Morena – Sabalgarh Section of SH – 23 (Project Road No: 7) – 70.00 Kms and (ii) Sabalgarh – Shampur Section of SH-23 (Project Road No: 22) |
MD, MPRDCL |
85.13 |
31. |
Rehabilitation and up-gradat ion of NH-209 from Km 123.550 to Km. 150.400 of Dindigul -Bangalore Road (Pol lachi to Coimbatore Sect ion) to four lane wi th paved shoulder in the State of Tami lnadu under NHDP – IV on EPC basis. |
National Highways Authority of India. |
414.90 |
32. |
Four Laning of Hubli - Hospet Section of NH-63 in the state of Karnataka on EPC Mode. Project Road Start from km 129.249 to km 267+000 on EPC Mode |
National Highways Authority of India. |
1334.70 |
33. |
Improvement/Augmentation of Four Laning from Km 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km 5.000 to Km 81.000] and Two Laning with Paved Shoulders from Km 79.340 to Km 118.795 (Existing Chainage) [Design Chainage KM 81.000 to Km 120.000] of Madurai – Ramanathapuram section of NH-49 [Total Design Length 115.000 KM] in the State of Tamil Nadu under NHDP Phase-III on EPC MODE |
National Highways Authority of India. |
937.08 |
34. |
Four Laning of existing Thiruvananthapuram Bypass from Kazhakkoottam (Thiruvananthapuram) to Mukkola Junction from km 0.000 to km 26.500 under NHDP Phase IIIA in the State of Kerala on EPC Mode |
National Highways Authority of India. |
669.06 |
35. |
Selam |
SE, Highways, C&M Circle, Selam |
295.19 |
36. |
Construction of Grade Seperator with First level Flyover along Dr. Nanjappa road and Second Level Flyover along Chinnaswamy road & 100 Feet road including pedestrian subway at Gandhipuram area in Coimbatore city |
SE, Highways, C&M Circle, Coimbature |
146.12 |
37. |
Upgrading Kanchipuram-Vandavasi Road (SH-116) Km: 14/300 - Km: 36/700 and Upgrading Sadras-Chengalpattu-Kanchipuram-Arakkonam-Thiruthani Road (SH-58) Km: 0/000 to Km: 26/811 |
PD, TNRSP-II, Tamilnadu |
184.97 |
38. |
Upgrading Arcot-Villupuram Road (SH-4) Km: 29/000 to Km: 110/165 and Km: 113/225 to Km: 114/600 in the state of Tamilnadu road sector Projects II |
PD, TNRSP-II, Tamilnadu |
320.02 |
39. |
Upgrading Malliyakarai-Rasipuram-Thiruchengode-Erode Road (SH-79) Km: 0/000 to Km: 30/600 and Km: 51/400 to Km: 71/300 in the state of Tamilnadu road sector Projects II |
PD, TNRSP-II, Tamilnadu |
224.06 |