Ongoing Major Projects

Sno
Name and Nature of the Project
Client
Contract Value in Crores
1. Construction of Elevated Highway along Avinashi Road in Coimbatore City from Goldwins to Upplipalayam Km. 147/100 -157/200 of (SHU-52) Tamil Nadu Road Development Company, Tamil Nadu 1033.40
2. 'Four Laning of Oddanchatram - Madathukulam section of NH-209 (New NH-83) (Design Ch. Km.29.000 to Km.74.380) under Bharatmala Pariyojna Phase-I under the category of Residual Works of NHDP on HAM in the State of Tamil Nadu NHAI 640.00
3. Two Laning with Paved Shoulder of Magadi to near Somwarpeth (Km 51.000 to Km 221.833 of SH 85, excluding the following common sections with Huliyudurga bypass km 76.520 to 78.410, common portion with SH 84 between km 88.700 to km 90.380 and common portion with NH 150 A in Nagmangala km 111.960 to km 113.260), 166 km in the State of Karnataka, India on Hybrid Annuity (DBFOMT) basis-KSHIP3-ADB II-CW-ITB-Package 2 Karnataka State Highways Improvement Project, Karnataka 600.00
4. Comprehensive Road Maintenance Contract (CRMC) of identified main road stretches in Secunderabad Zone of GHMC for 5 years GHMC 240.60
5. Comprehensive Road Maintenance Plan for maintenance of main roads in Khairtabad Zone-I of GHMC under Comprehensive Road Maintenance Contract (CRMC) for 5 Years GHMC 165.67
6. Upgrading and Maintenance of Cheyyur- Vandavasi- Polur Road (SH-115) from km 1/620 to km 42/660, km44/505 to km47/367, km52/700 to km78/295, km80/562 to km103/780 including ECR Link (ODR) Cheyyur – Panayur Road from km 0/000 to km 4/720 to two lane with paved shoulders and construction of bypasses for Vandavasi town from Km 47/367 to km 52/700 and Chetpet town from km 78/295 to km 80/562 and one realignment for Maruthadu village from km 42/660 to km 44/505 of SH-115 and maintenance of entire project stretch design length of 109.273 km” (in the State of Tamil Nadu on Engineering, Procurement and Construction (EPC) Mode) with 7 - years maintenance Tamil Nadu Road Development Company, Tamil Nadu 603.63
7. Widening of Existing Service roads from Nanakramguda to TSPA and Narsingi to Kollur and BT Overlay of Bitumen pavement from Gachibowli to Shamshabad of Outer Ring road, Hyderabad, Telangana Hyderabad Growth Corridor Limited 312.79
8. Four-laning of Bangalore-Mangalore Section from km 270+270 (Periya Shanthi) to km 318+755 (Bantwal) including 6-lane Flyover at Kalladka Town in km. 311 – km. 314 on NH-75 on EPC Basis in Karnataka NHAI 1100.88
9. Development of Road from Kanchugaranahalli to Jigani Via Harohalli and Urgandoddi (Km 0+000 to Km 33+200) and Section of Road from BM Road Junction to Coca Cola Factory (Km 0+000 to Km 3+000) of Bidadi – Harohalli Road in Bengaluru Urban/Rural District, (Package-3A) Karnataka Road Development Corporation Limited, Bangalore 137.08
10. Six laning of Ramanattukara Junction to start of Valanchery bypass section of NH – 66 (old NH-17) from Design Ch. 258+818 (Ex. km 27.840 of Kozhikode bypass) to Design Chainage 298+500 (Ex. km 304.250) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI 1745.00
11. Six laning from start of Valanchery bypass to Kappirikkad section of NH – 66 (old NH-17) from Design Ch. 298+500 (Ex. km 304.250) to Design Chainage 335+850 (Ex. km 349.260) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI 1595.00
12. Development of Six Lane Chittoor – Thatchur Highway from Km. 61.380 to Km. 96.040 on Hybrid Annuity Mode under Bharatmala Pariyojna, in the State of Andhra Pradesh and Tamil Nadu (Package-III) NHAI 765.00
13. Construction of Four lane road from IDA Pashamailaram Industrial Park to ORR (Patancheru – Shankerpally road Junction) from Km.0/0 to 4/658 in Sangareddy District Hyderabad Growth Corridor Limited 34.26